Ok so this obviously won't be from the first day of the layout and I promise to not include uninteresting pics, and I hope these progress pics help others as much as others that posted there layout steps had helped me.
Oh K guys here it is its a bit out of date so just kinda sort it out with your imagiminations
By the way the grey matter is roadway ( yes I know what it looks like )
the perimeter rail starting in the lower left is a 3% grade going up then leveling off at the top left inside then declines from the top right to just below the sawmill then there's a 2% grade rail inside of that doing the same . And lots of bridges
I got the darn ds64's figured out finallyyyyyyyyyyyyyyyyy . Here's how it had to be hooked up with a seperate power supply although it could also be connected right to the track power.
The ds64's each putting out 4 addresses ( 4 addresses = 4 tortoise switches) also needed an individual board address ( this took some reading) There are 11 ds64's with starting address of 1 and last ds64 has address 44 .
And the most recent achievements .
I got the right side yard\siding all installed . I have just 2 tortoise's left to install.
Its messy but I didn't want anyone thinking I took the summer off. I know it doesn't look like much but I haven't got a lot of spare time and I wanted everything lining up perfect.
Here's a bit of an update to what I've been upto I also included a few pics of items madmike threw in when I purchased a bunch of his diaramas and other scratch builds
here's one of a few real nice water towers
Over all 2 diaramas in place
no diarama here just couple steamers with odds and ends in the background of scratch builts
the rail has to be put in place for these guys to get to work ( turnout is already in place)
I cut the benchwork for the river and I will complete a couple more bridges
My son and I had a few minutes so we tried to envision the new mountain \tunnel The mine will be propped in front and I will be using bragdon molds for the rocks
Another of the watertowers and thinking the Tannery may have found a new home
Rail to the chemical factory
From the chemical factory
Barnstead equipment
Another angle
Another water tower
Duffy's got rail
Stuffy's brwery waiting for its rail
Another of mikes creations
No flash was used for these pics
this pic is with flash on just to show the color a bit better
Seems hard to get a descent natural picture.
For the roads I'm venturing into many different methods ,what you see on previous post were just plaster paint brushed on to make the general contour but now I'm really trying out different methods. I've tried adding sifted baseball diamond sand and cementing it with water/glue mix this gives a good base then I've tried in different areas with first brushing the width of the road with laytest paint then sifting the same sand and adding several more layers of the same paint and sand but I'm finding it to course looking unless you go along with your finger to break up the top layer , this looks good. Now I've tried one other top layer which is take the same sifted sand and now put it in a yogurt style plastic container with a panty hose screen ( hope the wife doesn't read this) and shaking this on the paint layer.
Here's some pics I took as I went along
My paint is just some white paint I had left over and I added some brown dollar store paint to give it an earth tone color
This is how I sifted the gravel for the finer sifter
The sifter with panty hose screen
This is how the road looked after the previous coat I gave of paint and sand well at least the road on opposite side of bridge
the opposite side of bridge I just painted on wide enough for road and shook on the roadway with sifter
Using the shaker to add the dirt it comes out more like a dust then anything heavy
I then give the fresh roadway some ruts with the wooden end of a small paint brush
I finish by giving the raod another layer this fills in the ruts
Here's a couple more wooden bridges in place obviously I still got some scenery work to to around them but at least there in LOL.I may do a bit of weathering on them with some bragdon chalks.
I've been plugging away at my Campbells Barrel Factory so of course there's not enough time in the day for working on the rest of the layout, errrrrr that and I have to go out and make a living.
fast track to where we're at
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
a bit of scenery work on the chemical factory , finally got the track installed and ballasted and got a good start on the dirt road all the way behind Duffy's Coal. I have to make somemore trees up and add more ground fall junk.
[/URL]
[/URL]
[/URL]
[/URL]
WOW Lynn!! Its great to see pics from when the layout started to where you are now with some scenery down and buildings layed out!! I look forward to following this thread as you progress!!
:mrgreen:
As far as I've gotten around the room starting from the left side to around the corner and continueing onward.
[/URL]
[/URL]
[/URL]
[/URL]
And here's an over all pic from a few steps back
[/URL]
I'm thinking maybe to not paint in trees for two reasons one is I stink at it and two as my wife suggested, I will be building up the tree line at the base of the mountains with small trees and secondary growth stuffage
Here's a bit of whats been going on for past while as you can see most of the tree line has been planted along the ridge of the mountain.I've been trying to work from way back and come forward.
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
Here's a couple pics where I built the road and added a small scenery divider for Stuffies Brewery. For the hill I just stuck a piece of 2x4 down covered it with ground goop and earth and planted grass, I will be planting trees real soon to further devide up the scenery here as well as putting up a fence. Although Stuffey's will soon be moved.
[/URL]
[/URL]
[/URL]
[/URL]
So again change of plans , removed the mountain to make room for 90 foot TT. On the base of the TT I put a real thin coat of ground goop then a lite coat of sifted baseball diamond dirt then a coat of green ground fall. I tried some Bragdon powders around the walls of the TT but they didn't seem to take very well but it is dirtier looking. I also put down some ground goop between the tracks leading out to the TT and sifted some black sand blasting sand. Still more to do in this area one thing for sure this TT works well.
[/URL]
[/URL]
[/URL]
[/URL]
[/URL]
This is my newest crazy idea for an additional 2 bridges crossing over lower rails.
So before I could go forward with wharf I have to get past the new idea.
I better say this is a kinda mock up in PS.
Tonite I finally got some plaster down , it took a while to get everything lined up and I hope when I go to lay the track down it still lines up. Pics real soon.
WHOA Lynn, looks like posted to soon and in the middle of you posting more progress. Man i love all the pics and shots of your layout. You do some real nice work!! And i love the snowy mountain backdrops!!!
As i said above, i look forward to seeing more pics from you!! :mrgreen: