02-18-2010, 01:17 AM
So lately Ive been pullin goofy hours doing snow removal, and so now that Im done for a while Im still on a goofy sleep schedule and find myself up late. But when Im up late I gotta be quite, since everyone else is sleeping. So I head to the basement turn my radio on (quietly obviously) and have been messin around on the layout. I can now say all my track is layed, and I started a project with my Walthers grain elevator. Im cuttin it kinda in half and adding silos on both sides of it to go along a wall.
Next on my to do list is to start soldering feeders to the track and run the main power wires under the layout, and finally clean the track, and I can start running trains.
Next on my to do list is to start soldering feeders to the track and run the main power wires under the layout, and finally clean the track, and I can start running trains.