UP SD40-2's NEW Layout
#83
Thanks so much Chris! Big Grin

I'm sorry it takes so long between posts, just so busy anymore Sad , but rest assured progress though small, is constantly being made Thumbsup .

As I have mentioned, things are kinda tight these days money wise, so I have been trying to make some really neat stuff on the cheap Wink . I bought the electric motors background building...
[Image: DSCN1139%202_zpsqspzyhsz.jpg]

I wanted to use that building as a big part of my GERN, by enlarging it with styrene I easily made that background building into a full blown factory for just 1/3rd of the cost of buying a big factory Wink ....
[Image: DSCN1135%202_zpsoccsssh3.jpg]

[Image: DSCN1142_zpsiy8rndtl.jpg]

My elevator is 100% styrene, and again as mentioned, the silos are PVC, total cost so far is just $12.00 Big Grin ...
[Image: DSCN1137_zpsidgzpzcl.jpg]

[Image: DSCN1154_zpsfmvyepo1.jpg]

Well, I have painted all the Buildings to my GERN now, still have lots left to do, weathering the buildings, install windows, doors, roof/other assorted building details, lots of piping left to do, ground cover, aww, so much more. Progress has been made though! Thumbsup ...
[Image: DSCN1163_zpsvlcflmh1.jpg]

[Image: DSCN1156_zpsaopgsaub.jpg]

More progress on the next post Wink , stay on track folks!
[Image: sig2.jpg]-Deano
[Image: up_turb10k_r.gif]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 2 Guest(s)