09-10-2015, 07:49 PM
Thanks so much Chris!
I'm sorry it takes so long between posts, just so busy anymore , but rest assured progress though small, is constantly being made .
As I have mentioned, things are kinda tight these days money wise, so I have been trying to make some really neat stuff on the cheap . I bought the electric motors background building...
I wanted to use that building as a big part of my GERN, by enlarging it with styrene I easily made that background building into a full blown factory for just 1/3rd of the cost of buying a big factory ....
My elevator is 100% styrene, and again as mentioned, the silos are PVC, total cost so far is just $12.00 ...
Well, I have painted all the Buildings to my GERN now, still have lots left to do, weathering the buildings, install windows, doors, roof/other assorted building details, lots of piping left to do, ground cover, aww, so much more. Progress has been made though! ...
More progress on the next post , stay on track folks!
I'm sorry it takes so long between posts, just so busy anymore , but rest assured progress though small, is constantly being made .
As I have mentioned, things are kinda tight these days money wise, so I have been trying to make some really neat stuff on the cheap . I bought the electric motors background building...
I wanted to use that building as a big part of my GERN, by enlarging it with styrene I easily made that background building into a full blown factory for just 1/3rd of the cost of buying a big factory ....
My elevator is 100% styrene, and again as mentioned, the silos are PVC, total cost so far is just $12.00 ...
Well, I have painted all the Buildings to my GERN now, still have lots left to do, weathering the buildings, install windows, doors, roof/other assorted building details, lots of piping left to do, ground cover, aww, so much more. Progress has been made though! ...
More progress on the next post , stay on track folks!
-Deano