01-10-2016, 06:05 PM
The base is started!
8 mm plywood base. I've glued the piedestal on the top and a piece of pine underneath. I drilled the holes for the bearings with my pillar drill to get the hole in plumb.
The axle will be replaced with a stainless tube.
The brackets that holds the tie rods are in place.
Had to see how it looks....
The pit wall is to be built using ties. And the pit rail has to be laid. I will use code 40 in the pit..
8 mm plywood base. I've glued the piedestal on the top and a piece of pine underneath. I drilled the holes for the bearings with my pillar drill to get the hole in plumb.
The axle will be replaced with a stainless tube.
The brackets that holds the tie rods are in place.
Had to see how it looks....
The pit wall is to be built using ties. And the pit rail has to be laid. I will use code 40 in the pit..