getting back into MRR
#16
Gary S Wrote:Now, between ops sessions, what would you do to "reload" the train? You'll have to get the empties back into position behind the mill, andthe loaded cars will have to be taken to the place where they originate. Will you do this with the 0-5-0 switcher (by hand)? Or will you be running the trains backward under power (meaning they do have to climb those grades)? Or do the hidden tracks continue in hiding all the way back to where the loads originate from?

Currently it would be a diorama only, at some future point to be incorporated into a layout
(with occasional operations connecting the various dioramas together with unitrack)
as for the returns, both `empties' and `fulls' would remain hidden for the return trips to the cane-fields (so basically 2 separate ovals, with 2 identical trains- one full and one empty) so that empties are always only seen heading out from the mill and fulls only ever seen heading in towards the mill (it only requires the two tracks behind the backdrop or alternatively once the layout is actually built they could be run under it instead)
poopsie chicken tush
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)