02-26-2020, 08:08 PM
Well, every new idea needs to be drawn out to find any unforeseen issues.
I usually do this in my head as I go, but this building had to be drawn out so "I" could see where I'm going with this.
The floor plan showing the approximate positions of the 2 tracks.
I had to combine the work/tool area inside the floor plan, since 3 stalls is way too large for the area I have on the layout.
It turned out to be 12-1/2" wide X 7-1/2 deep, with a 2" overhang above the doorways making it 9-1/2 deep overall.
I usually do this in my head as I go, but this building had to be drawn out so "I" could see where I'm going with this.
The floor plan showing the approximate positions of the 2 tracks.
I had to combine the work/tool area inside the floor plan, since 3 stalls is way too large for the area I have on the layout.
It turned out to be 12-1/2" wide X 7-1/2 deep, with a 2" overhang above the doorways making it 9-1/2 deep overall.
~~ Mikey KB3VBR (Admin)
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???
~~ NARA Member # 75
~~ Baldwin Eddystone Unofficial Website
~~ I wonder what that would look like in 1:20.3???