doctorwayne's sorta one-foot challenge...
#45
I finally got the new maintenance structures in place, although the glue is not dry.

Here's the switch tender's shanty....

[Image: SWITCHMANS%20SHANTY.jpg]

...and the service area for the "BEE"...

[Image: SERVICE%20AREA%20FOR%20THE%20BEE%20-%203.jpg]

[Image: SERVICE%20AREA%20FOR%20THE%20BEE%20-%202.jpg]

[Image: SERVICE%20AREA%20FOR%20THE%20BEE%20-%201.jpg]

[Image: SERVICE%20AREA%20FOR%20THE%20BEE.jpg]

Not shown is the access plate in the service track for connecting a tank car to the pump shed, so that diesel fuel can be lifted to the storage tank.  I'll be adding more material to the ground cover after the stuff shown has dried, and will try to remember to take a picture of it.
The freight shed for Mount Forest is coming along well, too, with all of the brick cleaned-up, a new sign added, and construction of the floors starting later today.  When they're ready to install, I'll add the windows to the top floor, then its floor, then the windows for the next floor down, and so-on.

Wayne
Reply


Messages In This Thread
RE: doctorwayne's sorta one-foot challenge... - by doctorwayne - 05-01-2020, 01:54 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)