Full Version: My Grande Valley Railway in the "N"ormal scale
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Cataract surgery is slowing down any progress on the rebuild of the layout.So there may not be much progress to report on this project.
Cataract surgery was life changing for me, now Z scale seems HUGE! Best wishes for a speedy recovery/healing process!
I can already tell a difference,just glad I did not have this while I was still working.
My cataract surgery went fairly well, but it exposed some shortcomings in my re-attached retina (which was the cause of the cataract). However, I can now read my clock radio at night without glasses, at least in that eye.
I also have a colour perception difference between my eyes. One thinks that the hall carpet is taupe while the other sees it as ecru.


I have no further interest in discussing PRR green.
" taupe while the other sees it as ecru."

Those are colors??????????????????? Icon_lol
Overall shot of the 10'6" wall section.

[Image: Deconstruction_6.jpg]

Corner shot,current plan is to keep these two buildings where they are.The track you see will be moved forward and a couple more buildings added (at least one on each side of the street).

[Image: Deconstruction_10.jpg]

Now it's back into the destruct mode as that grade against the wall has to go.(there will be no grades in the new version of the GVR).
It's a mess now but I'm sure it will turn out great.
More destruction photos coming.Here is the first one.All of this is on it's way out,plus another 6'6" to make room for the Z layout.

[Image: Deconstruction_11.jpg]

Three of the shelves will be mounted on wall brackets.This is a picture of the brackets for the shelf I am working on now.These same brackets will also be the supports for the Z layout once I get it into the basement.

[Image: Bracket_1.jpg]
This is the last deconstruction picture.From here on out the updates will be build pictures.My thoughts are to have a train running by mid August then get started on the Z layout.

[Image: Deconstruction_12.jpg]
Here's the bench work drawing for the new and improved Grande Valley Railway.

[Image: GrandeValley-benchwork-1.jpg]
Nuther update ,two more screws and this side is ready for blue board.They a fast trip to Menards for the material for the open side.I estimate that I will have around $125.00 in this rebuild including new cork roadbed. 2285_

[Image: Deconstruction_13.jpg]

I think it will take longer to dump the accumulated junk than it is taking to rebuild the layout. Wallbang
:wait: :wait: :wait: :wait: :wait: Still no scenery? Eek Goldth
Mike said,
Quote: :wait: :wait: :wait: :wait: :wait: :wait: Still no scenery? Eek Goldth

Wallbang Eek Nope Some people Goldth
2285_ Goldth
I ran out of usable 2' extruded Styrofoam Wallbang Everything I have left is not wide enough or long enough to use Nope

[Image: Deconstruction_14.jpg]
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17