12-22-2013, 06:03 PM
Looking For Some Advice !!
I'll give you the preamble .....my layout is in ( will be in ) 2 sections , both about 10x3 or so .
The one section is constructed of 1x4's ( uprights ) and 1x3 horizontal pieces with 1x2's criss-crossing on angles for stability .
The second stage will be of similar materials but I have to have it moveable ( for reasons I won't bore you with ) so it will be on casters .The casters don't lock .
My concern is joining the two sections . They will have to be un-joined fairly quickly ,if need be , but I don't want to have just the trackwork being the " connection " incase I lean on things and cause the section on casters to shift !
Anyone done this ?
Thanks , T
I'll give you the preamble .....my layout is in ( will be in ) 2 sections , both about 10x3 or so .
The one section is constructed of 1x4's ( uprights ) and 1x3 horizontal pieces with 1x2's criss-crossing on angles for stability .
The second stage will be of similar materials but I have to have it moveable ( for reasons I won't bore you with ) so it will be on casters .The casters don't lock .
My concern is joining the two sections . They will have to be un-joined fairly quickly ,if need be , but I don't want to have just the trackwork being the " connection " incase I lean on things and cause the section on casters to shift !
Anyone done this ?
Thanks , T
To err is human, to blame it on somebody else shows management potential.