02-22-2009, 01:28 PM
Thanks Ralph, Josh and Jack.
Jack the roof will be left removeable just because. I'm slowly now working on the truck but once again no hurry. last nite I placed the sawmill in place n the layout and sealed it down and siliconed the edge of the base to seal the river bottom. I figure whats left to do on it can now be accomplished while it is in place. I did manage to drill a hole through its base and run a lite and wires for interior liting.
Once again I've grown tired of working on something and want to move on to get the river done so I can get the darn bridge put back in, afterall can't make any money with the trains sitting idle.
Jack the roof will be left removeable just because. I'm slowly now working on the truck but once again no hurry. last nite I placed the sawmill in place n the layout and sealed it down and siliconed the edge of the base to seal the river bottom. I figure whats left to do on it can now be accomplished while it is in place. I did manage to drill a hole through its base and run a lite and wires for interior liting.
Once again I've grown tired of working on something and want to move on to get the river done so I can get the darn bridge put back in, afterall can't make any money with the trains sitting idle.

Lynn
New Adventure <!-- l --><a class="postlink-local" href="http://bigbluetrains.com/forum/viewtopic.php?f=46&t=9245">viewtopic.php?f=46&t=9245</a><!-- l -->
Great White North
Ontario,Canada
New Adventure <!-- l --><a class="postlink-local" href="http://bigbluetrains.com/forum/viewtopic.php?f=46&t=9245">viewtopic.php?f=46&t=9245</a><!-- l -->
Great White North
Ontario,Canada