07-14-2015, 06:00 PM
I decided Imperial Oil had to go. Yard tracks and team track have moved slightly and staging has been added. I am happy with it now and look forward to my track getting here so I can get things started.
Ideally, this would be laid out on a 25-30' straight section but it needs to work with my available space. Curves are 22 degrees and I will be using the RSC-14 which is the same length as a RS11/18 and cars will be in the 40-50' range so things should flow well. I'll get the track down and then add some roads and those ugly get in the way of good pics power poles.
Ideally, this would be laid out on a 25-30' straight section but it needs to work with my available space. Curves are 22 degrees and I will be using the RSC-14 which is the same length as a RS11/18 and cars will be in the 40-50' range so things should flow well. I'll get the track down and then add some roads and those ugly get in the way of good pics power poles.
Stephen
Layout 1. Freelanced, present day short line set in Nova Scotia, Canada.
https://bigbluetrains.com/showthread.php?tid=9643
Layout 2. Prototype CNR Kensington Subdivision 1977-1985
https://bigbluetrains.com/showthread.php?tid=9929
Layout 1. Freelanced, present day short line set in Nova Scotia, Canada.
https://bigbluetrains.com/showthread.php?tid=9643
Layout 2. Prototype CNR Kensington Subdivision 1977-1985
https://bigbluetrains.com/showthread.php?tid=9929
