My Grande Valley Railway in the "N"ormal scale
Mainline is in. 2285_ Will wire up, the Control Master tomorrow and test drive the layout till I know the trackwork is acceptable. Then I will do the yard,the grain elevator (it will be bigger than version 1.0) I already have the siding for Fowler's Fine Furnishings installed. :mrgreen:

Oh yeah,I need to do the siding for the Bagel factory too.
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 8 Guest(s)