08-18-2015, 06:27 PM
Mainline is in.
Will wire up, the Control Master tomorrow and test drive the layout till I know the trackwork is acceptable. Then I will do the yard,the grain elevator (it will be bigger than version 1.0) I already have the siding for Fowler's Fine Furnishings installed. :mrgreen:
Oh yeah,I need to do the siding for the Bagel factory too.

Oh yeah,I need to do the siding for the Bagel factory too.
Johnathan (Catt) Edwards
"The Ol Furrball"
"I'm old school,I still believe in respect"
"The Ol Furrball"
"I'm old school,I still believe in respect"