07-01-2018, 02:01 AM
Work in progress welcome too?
An example of a prepared/ milled Athearn RTR GP38-2 shell awaiting eight prewired SMD LEDs to be glued in the new ditch lights and old bulb holes and a "naked" Trainman drive with a Tsunami 2 and six 4k6 restores for the LEDs. The stiff wires are the perfect sugar cube support.
![[Image: 42219855175_6343dd030a_c.jpg]](https://farm1.staticflickr.com/846/42219855175_6343dd030a_c.jpg)
Good news, the shell fits :-) The 787 is not a good road number for a contemporary layout. It will be renumbered to 279 or 616 with four stacks when I get them from Shapeways.
![[Image: 43077158742_91881b5f50_c.jpg]](https://farm2.staticflickr.com/1768/43077158742_91881b5f50_c.jpg)
This engines will be ready for revenue service on Monday morning. The faraway locomotive works have no day off on Sundays ;-)
An example of a prepared/ milled Athearn RTR GP38-2 shell awaiting eight prewired SMD LEDs to be glued in the new ditch lights and old bulb holes and a "naked" Trainman drive with a Tsunami 2 and six 4k6 restores for the LEDs. The stiff wires are the perfect sugar cube support.
![[Image: 42219855175_6343dd030a_c.jpg]](https://farm1.staticflickr.com/846/42219855175_6343dd030a_c.jpg)
Good news, the shell fits :-) The 787 is not a good road number for a contemporary layout. It will be renumbered to 279 or 616 with four stacks when I get them from Shapeways.
![[Image: 43077158742_91881b5f50_c.jpg]](https://farm2.staticflickr.com/1768/43077158742_91881b5f50_c.jpg)
This engines will be ready for revenue service on Monday morning. The faraway locomotive works have no day off on Sundays ;-)
Reinhard
