Freight train crew questions
#17
Charlie B Wrote:And it won't be too long before the trains will be operated by the dispatchers strictly by remote control, no crews at all. My now retired FRA man was telling me it wasn't far away. There was a mine railroad in Ohio in the 70's that did this, so it isn't impossible. I just wonder how many amps the DCC booster pack will require. Goldth
Charlie


That would be the Muskingdum Electric Railway..The MER shuttle coal between a strip mine and a American Electric Power power plant near Zanesville.AEP own the MER.

MER cease operations in 2002 when the mine ran out of economically recoverable coal according to my "short line "notes...
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)