09-19-2009, 07:23 PM
No time to post picks, because i'm gonna be spending all today and tommorow finishing this thing!
I have the base board and one 4-track K-brace complete. I have the assemblies for two more K-braces, and i'll be checking how much wire i have so i can pick up some more tommorow.
I should have a good 4-foot section of the NEC in HO, minus some details like insulators.
I'll install the track tomorrow, and then the wires., and hopefully i can get the wiring over the switch right and fast enough. It will be a speed run, but i think you guys will like it!
wish me luck!
I have the base board and one 4-track K-brace complete. I have the assemblies for two more K-braces, and i'll be checking how much wire i have so i can pick up some more tommorow.
I should have a good 4-foot section of the NEC in HO, minus some details like insulators.
I'll install the track tomorrow, and then the wires., and hopefully i can get the wiring over the switch right and fast enough. It will be a speed run, but i think you guys will like it!
wish me luck!
Modeling New Jersey Under the Wire 1978-1979.
![[Image: logosmall.png]](http://i543.photobucket.com/albums/gg445/CAB_IV/Model%20Trains%202013/logosmall.png)