GEC's Scratchbuild Summer '09 Challenge
#19
No time to post picks, because i'm gonna be spending all today and tommorow finishing this thing!


I have the base board and one 4-track K-brace complete. I have the assemblies for two more K-braces, and i'll be checking how much wire i have so i can pick up some more tommorow.

I should have a good 4-foot section of the NEC in HO, minus some details like insulators.

I'll install the track tomorrow, and then the wires., and hopefully i can get the wiring over the switch right and fast enough. It will be a speed run, but i think you guys will like it!

wish me luck!
Modeling New Jersey Under the Wire 1978-1979.  
[Image: logosmall.png]
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)