Input on a "Temporary" Shelf Track Plan
#55
Larry-how do you generate your switch list? I have 6 areas to switch and my A/D track holds 3-4 cars. I could possibly bring in a couple of more than 4 cars but I would have to seperate them at some point because there is a road that crosses the tracks from a freight handling area to the other side of the layout.
Bob
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)