03-02-2010, 10:31 AM
Larry-how do you generate your switch list? I have 6 areas to switch and my A/D track holds 3-4 cars. I could possibly bring in a couple of more than 4 cars but I would have to seperate them at some point because there is a road that crosses the tracks from a freight handling area to the other side of the layout.
Bob
Bob
