03-02-2010, 11:20 AM
foulrift Wrote:Larry-how do you generate your switch list? I have 6 areas to switch and my A/D track holds 3-4 cars. I could possibly bring in a couple of more than 4 cars but I would have to seperate them at some point because there is a road that crosses the tracks from a freight handling area to the other side of the layout.
Bob
I use a random rotation with switch lists or waybills.
I operate my ISLs based on Monday through Friday work week ..I like at least 7 industries and a "transload" track.
As examples.
Monday.
I will switch industries A,C,E.
Tuesdays
I will switch industries B,D,F.
Wednesday.
A,C,E G and the transload track.
Thursday
B,D,F
Friday
G,A,E and transload
---------------------
I also like a 2 track "overflow" yard.This yard gets switch as needed.
I type each days switch list using Note pad and and then save it and then print it..I do this every week so I can rotate cars and eras at will without the need to retype the industry's name..Some days I may make a setout without a pickup or a pickup without a setout..I may spot a car in the "overflow" yard.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!