And as a progress report:
Got the wire pulled for the electrical service.
Turned on the water - only one leak, where I didn't tighten the faucet at the train building. Easy fix - tighten it!
Need to finish backfilling the ditch.
Hired a finisher/painter for the sheetrock - will start on Friday.
Ordered the brick for the exterior - to be delivered by Friday.
Things are looking up!