07-23-2010, 08:40 PM
I expect that refers would be iced by the railroad before being delivered and far enough in advance that they could be cooled before loading. Unless the shipper was big enough to have their own loading plant.
Not sure about the cleanout. Is this for water or the debris from the load? My inclination would be to cleanout at the destination.
Not sure about the cleanout. Is this for water or the debris from the load? My inclination would be to cleanout at the destination.
David
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
Moderato ma non troppo
Perth & Exeter Railway Company
Esquesing & Chinguacousy Radial Railway
In model railroading, there are between six and two hundred ways of performing a given task.
Most modellers can get two of them to work.
