08-25-2010, 07:19 PM
Look at that, I actually did go back to working on the GE's
done with the painting and decaling on the Dash 8-40B, almost done with the U30B
done with the painting and decaling on the Dash 8-40B, almost done with the U30B
Tom
Model Conrail
PM me to get a hold of me.
Model Conrail
PM me to get a hold of me.
