01-08-2009, 09:43 AM
nachoman Wrote:Good to see you here, Harold. And good article. I have been (slowly) handlaying code 55 in HOn3, and have been spiking every other tie on curves, and every 4th tie on straightaways. Do you pre-bend the rail for the curves?
If the geometry of the track is right the rail bends into the right radius between rail joiners.
![[Image: 002405_bad_track2.jpg]](http://www.pacificcoastairlinerr.com/1905/code_55/image/002405_bad_track2.jpg)
The rails in the replaced track on the left only need a few spikes to keep them in gauge. The piece of roadbed on the right had a kink.
I am only spiking every 12-15 ties and it stays in gauge.
Harold
