Placing Rail Served Industries On Layout Edge
#50
I just thought of another possible solution to your problem. What if the track was inside the building but in front of the loading dock? Your track would then be right on the edge of the bench work so you might need a small plexiglass protector to keep equipment from taking the "big fall," but you could have an open warehouse on the edge with ready access to the cut. The added advantage is that you would not be trying to fish an uncoupling tool in and around details on the warehouse floor.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)