02-26-2011, 06:08 AM
All I plan on doing when modeling the TQW warehouse on my version of the EFRR is to only drag cuts in and out once they have all been unloaded.
Charlie Barenfanger designed it as a run through track with a run around track outside to the rear, specifically so that rail cars can be unloaded out of the weather and switching minimized.
Mark
Charlie Barenfanger designed it as a run through track with a run around track outside to the rear, specifically so that rail cars can be unloaded out of the weather and switching minimized.
Mark
Fake It till you Make It, then Fake It some More
