01-14-2012, 06:48 PM
Well I got the 2" foam cut and glued in place. On top of this will be the 1" foam that I laid out the track plan on. So I may even be able to have some track down by next weekend. Tomorrow I plan to attach the pink foam and seal up the joints.
![[Image: IMG-20120114-00034.jpg]](http://3.bp.blogspot.com/-pCSLQ2jiDU8/TxIhsoBtYZI/AAAAAAAAADw/g6LpdWhO-r0/s1600/IMG-20120114-00034.jpg)
![[Image: IMG-20120114-00034.jpg]](http://3.bp.blogspot.com/-pCSLQ2jiDU8/TxIhsoBtYZI/AAAAAAAAADw/g6LpdWhO-r0/s1600/IMG-20120114-00034.jpg)
![[Image: IMG-20120114-00035.jpg]](http://1.bp.blogspot.com/-85GnJCBW5VA/TxIhuvw4jmI/AAAAAAAAAD4/boa5Q8D74o4/s1600/IMG-20120114-00035.jpg)
That light at the end of the Tunnel isn't heaven.........ITS A TRAIN!
My Railpictures.net Pictures
My Ramblings and Pictures
My Railpictures.net Pictures
My Ramblings and Pictures