01-30-2012, 12:30 AM
I finished wiring the second section last evening, checked all the connections with a multimeter, and cleaned the track. However, I didn't get to take any pics or do a slow speed test run, will do that today.
Two sections down, one to go!
Svein
Two sections down, one to go!

Svein