WOOHOO! Good weather = time to build
And the 11 track staging yard. It hangs in the middle of the room, with removable sections connecting to the layout. All of this is easily removable, however, the yard and the connection to the left will stay in place most of the time. The connection across the door is put in only when needed. The door can be placed in the open position during sessions, with the screen door keeping the elements out. That way, people aren't trapped in the room. The arrangement is quite stable, believe it or not. Triangulation rules!

   

Side view - also note the cool intermodal stuff. In the ops session, we ran a 26 car stack train!

   
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 14 Guest(s)