Acceptable grades
#24
As most here know I model the Chesapeake & Ohio. That railroad goes up and down a lot getting through West Virginia. I doubt if it exceeds 2% anywhere except maybe getting to a mine off the main. I have accepted the fact I will have to have some steep grades. As I am writing this I thought of something. To have a 2% grade reaching 10" I would need about 35 feet of track. what if, What if I raised it 1" in the first foot go level for 3' then rise 1" in next foot, 3' level again then 1" in 1'. Continue until I reach desired elevation. I know sounds stupid but that way in a 30 car train I would have only4-8 cars on a grade at any given time. :?:
Les
<!-- m --><a class="postlink" href="http://www.lesterperry.webs.com/">http://www.lesterperry.webs.com/</a><!-- m --> Check it out
http://www.youtube.com/lesterperry/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: