HO Freelance Shelf / Switching Layout
#66
Keep in mind that the Medusa Cement has 8 silos. You could load cement, sand, fly ash, and gravel all on the same siding. The silos could hold all of these products as well as others. You need a drill track that's at least 24 inches long, so I would use the track labeled sand load / unload as the drill track. I drew up another track plan. I put a parking Lot / loading dock area on the right side with an overpass hiding the end of the drill lead.

[Image: 8411514620_e6e591a577_o.jpg]

or we could simplify the track work.

[Image: 8411610006_29abdc82a3_o.jpg]
Mike Kieran
Port Able Lines

" If the world were perfect, it wouldn't be " - Yogi Berra.
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)