08-15-2009, 09:15 AM
Kevin asks:For the prototype modelers, how far can you take it, or how far would you take it?
----------------------------------
To the Nth degree?
I suspect each prototype modeler would need to set his/her goal.
Many may recall I am modeling a "paper" switching railroad owned jointly by NS and CSX as shared access.
My goal is freelance prototype railroad base on a "paper" railroad where CSX and NS rotates locomotives on a monthly bases..That means I can use either CSX or NS units depending on the "month" I am modeling.
For me that's where prototype modeling stops as everything else is freelance including the 12 block urban industrial branch my CB&T operates over.The CB&T is operated with its own crews and has a general manager and customer service representatives..
----------------------------------
To the Nth degree?
I suspect each prototype modeler would need to set his/her goal.
Many may recall I am modeling a "paper" switching railroad owned jointly by NS and CSX as shared access.
My goal is freelance prototype railroad base on a "paper" railroad where CSX and NS rotates locomotives on a monthly bases..That means I can use either CSX or NS units depending on the "month" I am modeling.
For me that's where prototype modeling stops as everything else is freelance including the 12 block urban industrial branch my CB&T operates over.The CB&T is operated with its own crews and has a general manager and customer service representatives..
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!