TIME FOR SOME CHANGES
#9
Have you ever started a change and wished you left it alone?
This project is turning into a nightmare. I have had a connecting track between coal mine and power plant for about 15 years. It has been one of those pain in the a** operations but I lived with it. Loads went into power plant and came out at coal mine. Empties went into mine and came out the power plant. I decided I have had enough with it. "TIME FOR A CHANGE" . Here is a drawing of what it is/was. All of these lines are double track

[Image: trackplan1a.jpg]

This is what it is/will be, maybe. These drawings don't show scenery and buildings to be dealt with

[Image: trackplana.jpg]

Looks easy enough but it is turning into a nightmare. nothing is going right. It is hard to reach. I am loosing what little bit of a mind I have left Wallbang 35
Les
<!-- m --><a class="postlink" href="http://www.lesterperry.webs.com/">http://www.lesterperry.webs.com/</a><!-- m --> Check it out
http://www.youtube.com/lesterperry/
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)