A Look At Slate Creek.
#15
Paul,I thought I answered your questions. 357

OK..Lemme me see if I can get it right this time. Icon_lol
------------------------
Personally i always like some explanation about the way you like to operate your switching layout.
--------------------
Like the prototype my operation will vary from day to day like I mention.

I will be using a MRC Tech II 1400 or my Control Master 20.
----------------------------
Fiddling cars from and to the main?
---------------------------
Yes..I will make up the short local on the main like it just arrived and pulled to a stop..
----------------------------
Can the fiddle track be reached easily, or is it tucked behind industries?
----------------------------
There will be no hidden fiddle track(s).I wish I did have room for a 2-3 track staging yard but,that's impossible for the time being.
---------------------------

Where do you envision fiddling?
--------------------------

I will make up trains for each "day" and will more then likely use small plastic storage boxes divided into 2 sections.That way I can rotate cars without that age old cry of--gee whiz there's that Chessie gon again!!

I will use removable loads.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)