10-16-2011, 09:33 AM
Paul,I thought I answered your questions.
OK..Lemme me see if I can get it right this time.
------------------------
Personally i always like some explanation about the way you like to operate your switching layout.
--------------------
Like the prototype my operation will vary from day to day like I mention.
I will be using a MRC Tech II 1400 or my Control Master 20.
----------------------------
Fiddling cars from and to the main?
---------------------------
Yes..I will make up the short local on the main like it just arrived and pulled to a stop..
----------------------------
Can the fiddle track be reached easily, or is it tucked behind industries?
----------------------------
There will be no hidden fiddle track(s).I wish I did have room for a 2-3 track staging yard but,that's impossible for the time being.
---------------------------
Where do you envision fiddling?
--------------------------
I will make up trains for each "day" and will more then likely use small plastic storage boxes divided into 2 sections.That way I can rotate cars without that age old cry of--gee whiz there's that Chessie gon again!!
I will use removable loads.
OK..Lemme me see if I can get it right this time.
------------------------
Personally i always like some explanation about the way you like to operate your switching layout.
--------------------
Like the prototype my operation will vary from day to day like I mention.
I will be using a MRC Tech II 1400 or my Control Master 20.
----------------------------
Fiddling cars from and to the main?
---------------------------
Yes..I will make up the short local on the main like it just arrived and pulled to a stop..
----------------------------
Can the fiddle track be reached easily, or is it tucked behind industries?
----------------------------
There will be no hidden fiddle track(s).I wish I did have room for a 2-3 track staging yard but,that's impossible for the time being.
---------------------------
Where do you envision fiddling?
--------------------------
I will make up trains for each "day" and will more then likely use small plastic storage boxes divided into 2 sections.That way I can rotate cars without that age old cry of--gee whiz there's that Chessie gon again!!
I will use removable loads.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!