A Look At Slate Creek.
#79
Here's possible HO plan for Slate Creek Industrial lead and if used will be the home terminal for the Summerset Ry.SSRY is the 8th shortline owned and operated by CDB Industries.

SSRY is 7 miles long and serves 2 industrial leads Slate Creek and 18th St industrial.

Motive power is a SW1500 with a SW7 as a back up unit and is lettered for Huron River..This unit is kept at 18th St Industrial..


SSRY interchanges with NS and handles around 2400/yr.

I can squeeze 7' by using a 6' dresser top* for the "bench work". I will use a simple frame without legs.



[Image: slateCreek8.jpg]

The tan area is a trailer drop lot and the building across the tracks from the drop lot is the SSRY office-a BLMA yard office.

The lead is 27".



*I really didn't want to use the dresser top but,I think if I used a vinyl table cloth under the frame of the layout that should eliminate any scratches.
Larry
Engineman

Summerset Ry

Make Safety your first thought, Not your last!  Safety First!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)