The traveling Grande Valley Railway (Onandaga Sub)
#27
Progress pic showing what I have done so far,ignore the mess behind the layout that thing will probably never get done.Track in front of retaining wall goes down to a two track staging yard which is going to be a seperate (plug-n-play) part of the layout.

[Image: n-plan-f.jpg]

Here is a pic showing the start of the staging yard.When built this will bolt to the layout right where that T pin is in the upper pic.Since I need more track to extend one of my sidings I will probably expand the yard from it's current 32" to 38" which should be a big enough yard for a layout this size.

[Image: n-plan-g.jpg]
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)