11-02-2015, 07:57 AM
What was said one time about needing a gymnasium for O Scale 2 Rail?
Gotta like that little switching layout and with some redesign away from the time saver concept it would be fun to operate.
In HO that would amount to a 1'x6' ISL.
Gotta like that little switching layout and with some redesign away from the time saver concept it would be fun to operate.
In HO that would amount to a 1'x6' ISL.
Larry
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!
Engineman
Summerset Ry
Make Safety your first thought, Not your last! Safety First!