CONSTRUCTION OF NEW LINE AT THE KISKI JUNCTION RAILROAD
#46
Charlie B Wrote:
Brakie Wrote:but forget signals and crossing protection.
Charlie
Charlie;
R J Corman installed those steel ties here in Frankfort when they did their tunnel enlargement project last year. The track through the tunnel is in a crossing signal circuit. I think they have insulating pads between the ties and the rail. Train crews complain about the "weird" sound going through the tunnel as the steel ties make popping and cracking noises.
Ed
"Friends don't let friends build Timesavers"
Reply
#47
Thanks for posting all the updates! I have enjoyed following the progress. As someone else has mentioned, it is great to see rails going down instead of coming up.
Chuck
Detroit Connecting
We are your
inner-city connection.
Reply
#48
Here are a few picture of the line. The runaround is in and it is about 7200 feet long. Nice track, really feels good and the scenery is spectacular             10/7/2011
Charlie    
Reply
#49
Beautiful shots Charlie---looks like the Kiski Junction has been upgraded to a Class 1 railroad.
Reply
#50
First coal train loaded at Logansport today.Here the train is northbound past Kelly's Station
   
Here is the south end as they begin to get ready to load.    
The first coal loaded    
and a view of the overall operation.    
Charlie
Reply
#51
Here is a little video of the train today:

<!-- m --><a class="postlink" href="http://youtu.be/QKcq_R0Pqro">http://youtu.be/QKcq_R0Pqro</a><!-- m -->

Charlie
Reply