04-02-2019, 09:06 AM
Some real progress. Got all the roadbed down, turnouts (or switches) in place and some track down as well. I detailed the canyon since I have two bridges going over it. This took a while since it's been so long since I detailed or built anything that I must have eight coats of paint on the rocks and several attempts at the water before I called it done. Not too sure about the water though, still not as I would like it, but there's time to redo if I want.
Overall, messy but in progress:
Overall, messy but in progress:
Don (ezdays) Day
Board administrator and
founder of the CANYON STATE RAILROAD
Board administrator and
founder of the CANYON STATE RAILROAD