Grande Valley Railway in N version 4.0
#63
Nuther update for Gorman's.New load/unload shed is built and installed.There are now two tracks going through the shed for expedited loading or unloading.Next up will be some track painting and installing ground throws for the turnouts,then scenerydited loading or unloading.Next up will be some track painting and installing ground throws for the turnouts,then scenery. :mrgreen:

Took this pic from the opposite end just to give a different view of Gorman's.

That gray building to the far left side of the pic is Kellett Transfer and storage.There will be pics of it posted shortly (over the weekend if I'm lucky).

[Image: Gorman-Grain_rebuild-5.jpg]
Johnathan (Catt) Edwards
"The Ol Furrball"

"I'm old school,I still believe in respect"
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)