The creek is very good but the banks are outstanding. The composition of the green plants is so realistic!
Thanks Reinhard! The banks are why it took me 7 days to do 6 inches

. I want it to look as realistic as possible. I believe (rightly or wrongly) that if the ground covers and the trees and bushes look right then the rest of the RR will look better then it really is. To be honest it looks better in person than it does in the photographs.
Some in progress pics. Still need some underbrush from the big rock in the middle of the creek to the front edge and of course the whole area needs trees, trees and more trees! That whole area from the rock back to the tree line is maybe 6 inches and it took me a couple of hours.

Tyson Rayles Wrote:....and it took me a couple of hours. 
Time well-spent, I'd say.
Wayne
Gosh Mike, it keeps looking better each time you work on it.
Mark
I have to keep reminding myself.......this is N scale !!

8-)
Pete you mean you didn't know I had switched to Zn3?

I just heard a rumor that Mike was going to switch to Tn2 next fall.

Well I was until you let the cat out of the bag Catt !

No point in it now that everybody knows!

Catt Wrote:I just heard a rumor that Mike was going to switch to Tn2 next fall. 
That would almost be considered a monorail as the rails would be so close together as to have almost no gap between them! Standard T gauge is already only 3.2mm or 0.12". :?
Rest assured that my going into Tn2 will never happen !
